Before turning logged hours into an invoice, review the records behind the total. A large entry might be correct; two similar entries might describe different work. A useful check produces questions and traceable references.
1. Define the scope and period
Choose the client project or JQL scope and the exact dates used by your billing process. Be explicit about the time zone. Check what the reviewing account is allowed to see; an empty or partial result is not proof that all records are complete.
2. Review five useful candidates
- Matching entries that may need a duplicate check.
- Descriptions too short to explain the work to the reviewer.
- Unusually long individual entries.
- Worklogs with future start dates.
- High visible daily totals that need context.
Set thresholds that make sense for the engagement. Ask the author or project owner before correcting a record. These checks do not determine fraud, employee performance or contractual billability.
3. Avoid double-counting findings
One worklog can appear in more than one candidate group. A long entry can also contribute to a high daily total. Do not add those groups together as saved hours or recovered revenue.
4. Keep the decision trail
Retain the review period, issue and worklog references, reason and coverage status in your approved review location. Make any correction in Jira through the normal authorized process, then rerun the check if the invoice depends on the changed data.
Using Worklog Check
Worklog Check runs these read-only checks over 1–93 UTC days, up to 200 visible issues, 500 worklogs per issue and 10,000 worklogs in total. It provides an isolated fictional demo and a copyable CSV. It reviews existing worklogs; it does not calculate expected working schedules or prove that missing time has been logged.
Review Worklog Check pricing, permissions and trial on Marketplace →
